Blog: The UK data centre lighting market is projected to double in size over the next five years, reaching an estimated £130 million by 2030.

Blog: The UK data centre lighting market is projected to double in size over the next five years, reaching an estimated £130 million by 2030.

Posted on September 11 2026

According to recent market analysis by Whitecroft Lighting, the UK has established itself as a hotspot for European data centre development, identifying a demand for specialised mechanical and electrical (M&E) infrastructure.

 

While the data centre sector’s overall valuation is set to explode from £13 billion to £32 billion by 2028, fuelled heavily by the accelerated growth of artificial intelligence, the value of lighting as a proportion of total construction costs remains around 60% lower than in typical commercial builds. However, for manufacturers capable of operating at a hyperscale level, this £130 million lighting market presents an opportunity that eclipses established sectors such as commercial office space, entertainment, and education.

Navigating Complexity in Hyperscale Environments

“It is impossible to ignore a growing £32 billion market on your doorstep," explains Richard Williams, Head of Strategic Projects at Whitecroft Lighting. To put the scale into perspective, the entire capital investment budget for NHS estates this year is approximately £10 billion.

Yet, data centres present a uniquely complex environment. Developers face systemic, high-stakes challenges, from securing grid access and renewable energy to ensuring technical resilience and advanced cooling. In these environments, lighting cannot be an afterthought; it must be a fully integrated solution that actively supports a facility’s operational, environmental, and compliance goals.

De-Risking Projects Through Intelligent Infrastructure

For hyperscale developments, mitigating risk and accelerating construction schedules are paramount. The traditional approach to M&E installation is too slow and labour-intensive for modern data centres. This is where pre-assembled, modular innovation reshapes the proposition.

By utilising off-site assembled, plug-and-play lighting systems, contractors can drastically reduce the number of on-site connections. This not only cuts installation time by up to 50%, allowing two-person teams to install up to 250 metres of lighting per day, but crucially removes potential points of failure. Drawing on a rich heritage of delivering high-security, resilient lighting for critical infrastructure, such as the 40,000 LED luminaires installed at Hinkley Point C nuclear power station and the flagship rebuild of Manchester Airport’s Terminal 2, Whitecroft is applying this same rigorous, de-risked methodology to data centres across Europe.

Nuclear Lighting

Driving Efficiency, Circularity, and PUE

Modern data centre lighting must deliver far more than illumination; it must actively support a facility’s Environmental, Social, and Governance (ESG) targets. Through the implementation of high-efficiency LED luminaires, intelligent wireless controls, and application-driven design, lighting now plays a vital role in optimising a facility’s Power Usage Effectiveness (PUE).

The proposition is rooted in circular design principles. By engineering trunking systems from over 70% recycled aluminium, which is fully recyclable at end-of-life, and aligning manufacturing processes with Science Based Targets initiative (SBTi) validated net-zero journeys, the carbon footprint of the M&E phase is significantly reduced.

A Unified European Approach

As the international market matures at an unprecedented pace, developers require a sole-source, secure solution at scale. As part of the European Fagerhult Group, Whitecroft Lighting is collaborating technically and logistically with specialist brands, such as Netherlands-based Veko Lightsystems, to deliver seamless data centre projects. From internal white spaces to exterior security lighting, this unified approach ensures that every aspect of illumination and emergency backup is delivered with absolute certainty.

 
 

Richard Williams is Whitecroft's Strategic Project Manager, in charge of Whitecroft's Data Centre proposition.

Get in touch with Richard at: Richard.Williams@whitecroftlight.com

Data centre lighting: your questions answered

  • What's the most cost-effective lighting solution for a large data centre?

    For hyperscale facilities, the most cost-effective solution is a pre-assembled, modular LED trunking system. Solutions like Whitecroft’s Light Line utilise plug-and-play technology, allowing two-person teams to install up to 250 metres per day. This reduces on-site installation time by up to 50%, significantly cutting labour costs, while ultra-high-efficiency optics (delivering up to 212 lm/W) reduce installed load and lower long-term operational expenditure.

  • Which lighting products offer the best support for data centre maintenance needs?

    Lighting products engineered with advanced thermal management and high-longevity components offer the strongest maintenance support. Systems featuring extruded aluminium bodies built to reliably withstand 50°C+ ambient temperatures, paired with 100,000-hour LED drivers, drastically reduce maintenance frequency. Furthermore, a modular build allows for the rapid regeneration and replacement of individual components without dismantling the core infrastructure.

  • What's the best lighting system for energy-efficient data centres in the UK?

    The most energy-efficient systems integrate ultra-high-efficacy LEDs, precision optics, and smart lighting controls. By combining directional lenses that place light exactly where it is needed (achieving up to 188 luminaire lumens per watt) with wireless sensors like Organic Response, aisles are only illuminated when occupied. This minimises energy waste and directly supports the optimisation of the facility's Power Usage Effectiveness (PUE).

  • Which lighting options are most reliable for data centre environments?

    Reliability in critical white space environments is best achieved through off-site pre-assembly. By building and pre-testing modular trunking systems in a controlled manufacturing environment, the number of manual on-site connections is minimised, directly reducing the risk of component failure. Combined with robust thermal management to handle severe heat loads, this ensures stable, continuous performance.

  • Which lighting solutions are easiest to upgrade in an operational data centre?

    Modular LED trunking systems provide the most seamless upgrade paths in live operational environments. Because the infrastructure relies on a customisable, multi-core trunking spine (available in 7, 10, or 13-core configurations), facility managers can easily swap luminaires, integrate new smart sensors, or upgrade lumen packages without taking down the underlying containment, ensuring minimal disruption to active servers.

  • Which lighting systems simplify emergency compliance in data centres?

    Compliance is best simplified by systems that natively integrate emergency lighting and automated reporting into the primary lighting infrastructure. By embedding self-contained LiFePO4 batteries or Central Battery (CB) integration directly into the modular trunking, paired with DALI-enabled auto-test technology, data centres can ensure clear, compliant escape route illumination without the cost and complexity of a secondary network.

  • What's the best lighting option for minimising downtime during installation in a data centre?

    To keep critical-path construction schedules on track, project managers should specify pre-wired, plug-and-play lighting modules. Because these systems arrive on-site pre-assembled with minimal packaging, they are ready-to-lift and ready-to-fit instantly. This streamlined methodology prevents lighting installation from bottlenecking other vital M&E trades on site.

  • What’s the top lighting solution for meeting UK compliance in data centres?

    The top solutions are those explicitly engineered to meet both EN 12464 and TIA-942 standards. This requires advanced optics that deliver consistent vertical and horizontal illumination for precise server maintenance, alongside strict glare control (such as UGR <22 compliance) and accurate colour rendering. Partnering these optical standards with high-quality, SBTi-aligned manufacturing ensures complete alignment with modern UK operational and environmental compliance.