Astraea Academy, Sheffield

CASE STUDY

Providing Organic Response® for simplicity of installation and configuration

Accommodating almost 1,500 pupils from nursery to 6th form, Astraea Academy campus in Sheffield comprises a fabulous, refurbished Grade II listed building and a state-of-the-art new development.

Working to a restricted timescale to complete the build, a lighting solution that enabled rapid installation and flexibility was a priority. Whitecroft Lighting therefore supplied Selene with integrated Organic Response® wireless control to simplify installation and reduce the opportunity for project schedule disruption.

As a result, the proposed solution has reduced the overall installation time by an impressive fifteen percent and enabled commissioning of the control system in a three times faster timeframe.

The Solution

Used throughout the classrooms, a continuously mounted Selene features through wiring and single point ceiling suspension. Whilst the integration of Organic Response® sensor into the luminaire streamlines installation, without the need for additional equipment and costly, expert commissioning services.

Organic Response® works instantaneously and configuration is done simply via an app on a smartphone or tablet. This functionality allowed NG Bailey contractors to quickly and effortlessly commission the system in upwards of 80 classrooms without third party intervention. As the Organic Response® system can be easily reconfigured, it provides the ultimate in flexibility and is able to constantly deliver a well-lit and modern teaching space.

15%

saving on supply and install

3

times faster commissioning

585

Organic Response® sensors

Key Facts

Project name

Astraea Academy

Location

Sheffield

Project value

£23m

Client

Sheffield County Council

Architect

Race Cottam Associates

Contractor

NG Bailey

Opened

September 2018